Understanding Your Xactimate: ACV vs. RCV, Depreciation, and Line Items
If you’ve filed a property claim, you’ll likely receive an estimate generated in Xactimate. The format is standardized, but the terminology—ACV, RCV, depreciation—can be confusing. Here’s a simple guide to help you understand what you’re reading.
Key terms at a glance
- RCV (Replacement Cost Value): The cost to replace with new items of like kind and quality.
- ACV (Actual Cash Value): RCV minus depreciation; often paid upfront, with recoverable depreciation released after proof of completion.
- Depreciation: The age‑ and condition‑based reduction in value applied to many materials and finishes.
How line items are built
Each line details a scope component (e.g., “remove and replace 32 sq ft drywall”), a labor/material rate from regional price lists, and any applicable waste factors. Overheads and taxes appear at the end of the estimate. Photos, diagrams, and moisture logs often accompany the document.
Reading your estimate like a pro
- Match scope to damage: Do quantities and rooms reflect what you see?
- Check codes/upgrades: Some policies include code upgrade coverage; if required work isn’t shown, ask your adjuster.
- Identify exclusions: Contents, mold, or asbestos abatement may be addressed separately.
- Track supplements: Additional items discovered during mitigation are added via a supplement for approval.
Common questions
- Why is my first payment less than the total? Policies often pay ACV first; the remainder (recoverable depreciation) is released after repairs.
- Can I choose my contractor? In most cases, yes—check your policy details.
- What if prices change? Estimates reference current price lists; supplements address verified changes or hidden damages.
Understanding the structure of your estimate makes conversations with your adjuster and contractor faster and more productive.
Related reading
- How Restoration Companies Work with Insurance
- Protecting You From Costly Mistakes After a Disaster
- Browse more tips on our blog
Tips for negotiating supplements
Estimates are just the starting point. Once demolition begins, hidden damage often appears—wet insulation, deteriorated framing, or outdated electrical that needs upgrading. These items should be added as a supplement to the original scope.
- Document thoroughly: Use photos, moisture readings, and logs to support added line items.
- Request a walkthrough: Ask your adjuster or contractor to explain each supplement line by line.
- Stay proactive: Clarify what’s excluded (like mold or asbestos abatement) so you can address it separately.